What Manufacturing, Service, and Other Production Systems covers

On the FE Industrial and Systems exam this area covers manufacturing processes, production planning and scheduling, line balancing, lean and just-in-time, capacity planning, and service system design.

What the questions look like: A cycle time or takt time, a line-balancing efficiency, or a capacity computation.

Worth knowing cold: Takt time, cycle time and lead time are distinct and frequently confused. Fix the definitions before practising.

3 free Manufacturing, Service, and Other Production Systems practice problems

These come from our FE Industrial and Systems bank, written to the same specification as the exam. Try each one before opening the solution.

Problem 1

A plastics injection molding plant manufactures automotive interior trim panels. Annual customer demand is D = 48,000 units/year. The dedicated injection molding press has a production rate of P = 120,000 units/year. Each mold changeover and machine setup costs S = USD 250. The annual inventory holding cost is H = USD 4.50 per unit-year. Production operates on a finite production rate model (Economic Production Quantity / EPQ). Calculate the optimal production batch size (EPQ = Q*), the maximum inventory level accumulated during a cycle (I_max), and the total annual cost of machine setups and inventory holding.

  1. AEconomic batch size is 2,309 units (Max inventory = 1,385 units, Annual cost = USD 6,840)
  2. BEconomic batch size is 2,981 units (Max inventory = 1,789 units, Annual cost = USD 8,050)correct
  3. CEconomic batch size is 3,450 units (Max inventory = 2,070 units, Annual cost = USD 9,210)
  4. DEconomic batch size is 2,650 units (Max inventory = 1,590 units, Annual cost = USD 7,450)
Show the solution

**Step 1: Calculate the Optimal Production Batch Size ($EPQ = Q^*$)** Under the finite production rate model, inventory accumulates at rate $(P - D)$ while the press is running: $$Q^* = \sqrt{\frac{2 D S}{H \left(1 - \frac{D}{P}\right)}}$$ Given: $$D = 48{,}000\text{ units/year}, \quad P = 120{,}000\text{ units/year}$$ $$1 - \frac{D}{P} = 1 - \frac{48{,}000}{120{,}000} = 1 - 0.40 = 0.60$$ $$Q^* = \sqrt{\frac{2 \times 48{,}000 \times 250}{4.50 \times 0.60}} = \sqrt{\frac{24{,}000{,}000}{2.70}} = \sqrt{8{,}888{,}888.89} = 2{,}981.42 \approx 2{,}981\text{ units}$$ **Step 2: Calculate Maximum Inventory Level ($I_{max}$)** The run time per batch is $t_p = \frac{Q^*}{P}$: $$I_{max} = t_p (P - D) = Q^* \left(1 - \frac{D}{P}\right) = 2{,}981.42 \times 0.60 = 1{,}788.85 \approx 1{,}789\text{ units}$$ **Step 3: Calculate Annual Setup Cost and Holding Cost** Number of production runs per year: $$N = \frac{D}{Q^*} = \frac{48{,}000}{2{,}981.42} = 16.10\text{ setups/year}$$ Annual setup cost: $$TC_{setup} = N \times S = 16.10 \times 250 = \text{USD } 4{,}025.00/\text{year}$$ Average inventory level is $\bar{I} = \frac{I_{max}}{2}$: $$TC_{holding} = \frac{I_{max}}{2} \times H = \frac{1{,}788.85}{2} \times 4.50 = 894.425 \times 4.50 = \text{USD } 4{,}024.91/\text{year}$$ Total annual inventory and setup cost: $$TC = TC_{setup} + TC_{holding} = 4{,}025.00 + 4{,}024.91 = \text{USD } 8{,}049.91 \approx \text{USD } 8{,}050/\text{year}$$ Notice that at the optimal batch size, annual setup and holding costs are precisely balanced.

Problem 2

A high-speed CNC turning center uses carbide cutting inserts to machine steel shafts. Tool life follows Taylor's tool life equation: $v \cdot T^n = C$ with tool life exponent n = 0.25 and Taylor constant $C = 75.0\text{ m/min}$. The machine operating cost rate (including machine depreciation and direct operator labor) is $C_o = 0.80\text{ USD/min}$. The tooling cost per cutting insert edge is $C_t = 12.00\text{ USD}$, and the tool change downtime is $t_c = 3.0\text{ min}$. According to the manufacturing economics formulations in the FE Reference Handbook, what is the optimum cutting speed (v_{opt}) that minimizes the total machining cost per part?

  1. A27.7 m/min cutting speed for minimum unit cost (Optimal tool life T_min = 54.0 min)correct
  2. B35.4 m/min cutting speed for minimum unit cost (Optimal tool life T_min = 32.0 min)
  3. C21.2 m/min cutting speed for minimum unit cost (Optimal tool life T_min = 80.0 min)
  4. D42.0 m/min cutting speed for minimum unit cost (Optimal tool life T_min = 20.0 min)
Show the solution

**Step 1: Tool Life for Minimum Cost Formulation** From the FE Reference Handbook (Manufacturing Processes / Economics of Machining): The tool life for minimum cost per unit ($T_{min}$) is given by: $$T_{min} = \left( \frac{1 - n}{n} \right) \left( \frac{C_t + C_o \cdot t_c}{C_o} \right)$$ where: - $n = 0.25$ - $C_t = 12.00\text{ USD}$ - $C_o = 0.80\text{ USD/min}$ - $t_c = 3.0\text{ min}$ **Step 2: Evaluate T_{min}** $$\frac{1 - n}{n} = \frac{1 - 0.25}{0.25} = \frac{0.75}{0.25} = 3.0$$ $$C_t + C_o \cdot t_c = 12.00 + (0.80 \times 3.0) = 12.00 + 2.40 = 14.40\text{ dollars}$$ $$\frac{C_t + C_o \cdot t_c}{C_o} = \frac{14.40}{0.80} = 18.0\text{ min}$$ $$T_{min} = 3.0 \times 18.0\text{ min} = 54.0\text{ minutes}$$ **Step 3: Calculate the Optimum Cutting Speed (v_{opt})** From Taylor's equation $v \cdot T^n = C$: $$v_{opt} = \frac{C}{T_{min}^n} = \frac{75.0}{(54.0)^{0.25}}$$ Evaluating the denominator: $$(54.0)^{0.25} = \sqrt{\sqrt{54.0}} = \sqrt{7.348469} = 2.710806$$ $$v_{opt} = \frac{75.0}{2.710806} = 27.667\text{ m/min} \approx 27.7\text{ m/min}$$ Conclusion: The optimum cutting speed for minimum cost is **27.7 m/min**.

Problem 3

An aerospace manufacturing cell fabricates carbon-composite fuselage ribs following Wright's cumulative learning curve model Y_x = K·x^b. Historical fabrication data indicates an 80% learning curve rate (s = 0.80), where the learning exponent is $b = \ln(0.80) / \ln(2) = -0.321928$. The very first production rib (unit 1) required $K = 500.0\text{ direct labor hours}$. Calculate the direct labor hours required to assemble the 16th unit (Y_{16} in hours).

Show the solution

**Step 1: Apply Wright's Log-Linear Learning Curve Formulation** From the FE Reference Handbook (Industrial Production / Learning Curves): $$Y_x = K \cdot x^b$$ Where: - $K = 500.0\text{ hours}$ (time required for the 1st unit) - $x = 16$ (unit number) - $b = \frac{\ln(0.80)}{\ln(2)} = \frac{-0.2231435}{0.6931472} = -0.321928$ $$Y_{16} = 500.0 \times 16^{-0.321928}$$ $$16 = 2^4 \implies 16^{-0.321928} = (2^4)^{\frac{\ln(0.80)}{\ln(2)}} = (2^{\frac{\ln(0.80)}{\ln(2)}})^4 = (0.80)^4$$ $$(0.80)^4 = 0.40960$$ $$Y_{16} = 500.0 \times 0.40960 = 204.80\text{ hours}$$ **Step 2: Verification by Doubling Rule** Under an 80% learning curve, every time cumulative production doubles, unit labor time decreases by 20% (to 80% of its previous value): - Unit 1: $500.0\text{ hours}$ - Unit 2 ($2 \times 1$): $500.0 \times 0.80 = 400.0\text{ hours}$ - Unit 4 ($2 \times 2$): $400.0 \times 0.80 = 320.0\text{ hours}$ - Unit 8 ($2 \times 4$): $320.0 \times 0.80 = 256.0\text{ hours}$ - Unit 16 ($2 \times 8$): $256.0 \times 0.80 = 204.8\text{ hours}$ Conclusion: The required direct labor duration for unit 16 is **204.8 hours**.

Find out where you actually stand

A free 20-question diagnostic across every FE Industrial and Systems knowledge area, scored in the real exam interface. You get a projected score and the areas costing you the most — so you know whether Manufacturing, Service, and Other Production Systems is where your time should go at all.

Start the free Industrial & Systems diagnostic

Retaking the FE Industrial and Systems exam?

Copy the scores from your NCEES diagnostic report and see whether Manufacturing, Service, and Other Production Systems is where your next attempt gains the most points, or whether another area deserves the time first.

Analyze my diagnostic report

Other FE Industrial and Systems knowledge areas