A time study records an observed time of 1.80 minutes per cycle for a task, with the analyst rating the worker's pace at 110% of normal (performance rating = 1.10). An allowance of 13% is applied for personal time, fatigue, and unavoidable delay. Using $NT = OT \times \text{rating}$ and $ST = NT \times (1+\text{allowance})$, what is the standard time for this task?
- A2.237 minutescorrect
- B1.980 minutes, which is the normal time before the allowance is applied, not the standard time
- C2.034 minutes, applying the allowance to the observed time instead of to the normal time
- D1.636 minutes, dividing by the performance rating instead of multiplying by it
Show the solution
A time study moves through two distinct corrections in a specific order: first the observed time is adjusted to normal time, removing the effect of this particular worker's pace being faster or slower than a defined normal pace, and only then is an allowance added on top of that normal time to account for the legitimate rest and delay every worker needs regardless of pace. Normal time: $NT = 1.80 \times 1.10 = 1.98$ minutes — this represents how long the task would take a worker performing at exactly normal pace, independent of who was actually timed. Standard time: $ST = 1.98 \times (1+0.13) = 1.98 \times 1.13 = 2.237$ minutes. This standard time is what production planning, labor standards, and incentive pay systems are built on — using the normal time alone (skipping the allowance) would set an unrealistic production target that doesn't account for the unavoidable personal and fatigue time every worker legitimately needs across a shift, leading to standards that look achievable on paper but aren't sustainable in practice.