Engineering Economics on the FE Civil exam

Engineering Economics accounts for 4 of the 110 questions — 3.6% of your exam. It sits in the middle of the paper by weight: too big to skip, not big enough to dominate your plan.

Questions4
Share of exam3.6%
Rank by weight14/18
In our bank14

What Engineering Economics covers

On the FE Civil exam this area covers time value of money, present and future worth, annual equivalent cost, rate of return, benefit-cost analysis, depreciation, and economic life and replacement analysis.

What the questions look like: A cash-flow problem solved with one factor from the Handbook interest tables, or a straight-line depreciation or benefit-cost ratio.

Worth knowing cold: Draw the cash-flow diagram before touching the calculator. Almost every mistake in this area is a sign or a timing error, not a factor lookup.

3 free Engineering Economics practice problems

These come from our FE Civil bank, written to the same specification as the exam. Try each one before opening the solution.

Problem 1

Two mutually exclusive alternatives are under consideration, each with a 6-year life and a MARR of 10%. Alternative A costs $50,000 and generates $12,000/year in benefits. Alternative B costs $80,000 and generates $17,500/year in benefits. Based on present worth analysis, which alternative should be selected?

  1. AAlternative A, since PW A = +$2,263 while PW B = −$3,783correct
  2. BAlternative B, since it has the larger annual benefit
  3. CAlternative B, since it has the larger initial investment and therefore larger scale
  4. DNeither — both alternatives should be rejected because PW B is negative
Show the solution

Compute the present worth of each alternative separately and compare. (P/A, 10%, 6) = [1 − (1.10) −6 ]/0.10 = 4.3553. PW A = −50,000 + 12,000(4.3553) = −50,000 + 52,263 = +$2,263. PW B = −80,000 + 17,500(4.3553) = −80,000 + 76,217 = −$3,783. Since the alternatives are mutually exclusive, the decision rule is to pick the one with the higher present worth among those with PW ≥ 0 (do-nothing is always an option). A has a positive PW; B does not. (B) and (C) are both distractors based on raw size (benefit or investment) rather than the actual time-value-of-money comparison, which is exactly the trap this kind of problem is designed to catch: a bigger alternative is not automatically the better economic choice. (D) is wrong because A should not be rejected; only B underperforms the MARR here.

Problem 2

Two mutually exclusive design alternatives are being compared using the present worth method at the firm's minimum attractive rate of return. Which statements about applying this method correctly are true? Select the two that apply.

  1. AEvery cash flow is discounted back to a single common point in time at the MARR
  2. BThe alternatives compared must cover the same analysis period
  3. CThe method deliberately ignores when each cash flow occurs
  4. DA negative present worth shows the alternative earns more than the MARR
Show the solution

The present worth method converts every alternative into one comparable number, and the two conditions that make that comparison valid are the two correct statements here. DISCOUNTING EVERYTHING TO A COMMON POINT at the MARR is the method itself: money arriving at different times is not directly comparable, so each flow is moved to a single date using the rate the firm requires, and only then can alternatives be ranked. EQUAL ANALYSIS PERIODS is the requirement that is most often violated in practice — comparing a fifteen-year alternative against a ten-year one on present worth alone is meaningless, and the standard remedies are to analyze over the least common multiple of the lives or to compare annual worth instead, which normalizes the time base automatically. IGNORING TIMING is the opposite of what the method does; accounting for timing is its entire purpose, and the payback period method is the one properly criticized for ignoring it. A NEGATIVE PRESENT WORTH means the alternative fails to earn the MARR, not that it exceeds it: a present worth of exactly zero means the alternative earns precisely the MARR, so anything above zero clears the hurdle and anything below falls short of it.

Problem 3

A flood control concrete drainage channel requires an initial capital construction cost of 2,400,000 USD. Routine annual maintenance is estimated at 35,000 USD per year indefinitely. In addition, major relining and sediment dredging costing 150,000 USD must be performed every 6 years in perpetuity. Assuming an effective interest rate of $6.0\%$, the capitalized cost of this perpetual infrastructure project is most nearly:

  1. A2,983,000 USD
  2. B3,342,000 USDcorrect
  3. C3,875,000 USD
  4. D4,250,000 USD
Show the solution

Step 1: Determine the capitalized cost of the initial construction expense $P_0$: $$CC_1 = P_0 = 2,400,000\text{ USD}$$ Step 2: Determine the capitalized cost of the annual maintenance expense $A_1 = 35,000\text{ USD}$: $$CC_2 = \dfrac{A_1}{i} = \dfrac{35,000\text{ USD}}{0.06} = 583,333\text{ USD}$$ Step 3: Convert the recurring periodic dredging cost $F = 150,000\text{ USD}$ (every $k = 6\text{ years}$) to an equivalent annual uniform series $A_2$: $$A_2 = F(A/F, i, k) = F \left[ \dfrac{i}{(1+i)^k - 1} \right]$$ $$(1 + 0.06)^6 = 1.418519$$ $$A_2 = 150,000\text{ USD} \times \left[ \dfrac{0.06}{1.418519 - 1} \right] = 150,000 \times \dfrac{0.06}{0.418519} = 150,000 \times 0.143363 = 21,504\text{ USD/year}$$ Step 4: Find the capitalized cost of the periodic dredging and sum all components: $$CC_3 = \dfrac{A_2}{i} = \dfrac{F}{(1+i)^k - 1} = \dfrac{150,000\text{ USD}}{0.418519} = 358,406\text{ USD}$$ $$CC_{\text{total}} = CC_1 + CC_2 + CC_3 = 2,400,000 + 583,333 + 358,406 = 3,341,739\text{ USD} \approx 3,342,000\text{ USD}$$ Distractor Analysis: - Option A (2,983,000 USD) omits the periodic 6-year relining requirement (2,400,000 + 583,333 USD). - Option C (3,875,000 USD) assumes relining occurs every year (150,000 / 0.06 = 2,500,000 USD). - Option D (4,250,000 USD) uses an interest rate of 4% instead of 6%.

Find out where you actually stand

A free 20-question diagnostic across every FE Civil knowledge area, scored in the real exam interface. You get a projected score and the areas costing you the most — so you know whether Engineering Economics is where your time should go at all.

Start the free Civil diagnostic

Retaking the FE Civil exam?

Copy the scores from your NCEES diagnostic report and see whether Engineering Economics is where your next attempt gains the most points, or whether another area deserves the time first.

Analyze my diagnostic report

Other FE Civil knowledge areas

Engineering Economics on other FE exams

The same knowledge area is weighted differently on each exam, and the questions differ with it.